Plans that slip

Spot slipping projects early and nudge the owner before the date moves.

Company plans slip quietly: a task misses its date, a dependency stalls, the launch moves. Hops watches your Asana or Jira projects, flags what is drifting and drafts the nudge to the owner.

What it does

  • Compares dates with progress. Hops reads due dates and task status in Asana or Jira for each project you listed.
  • Flags what is late or likely to slip. It says why, for example a blocked dependency, and names the owner.
  • Drafts a nudge per owner. Short and friendly, posted for you to review in Slack. Hops never changes dates itself.
  • Posts only what is new. Plans already flagged are not repeated, so the channel stays useful.
  • Checks the calendar. Hops uses Google Calendar to see launch and review dates coming up.

Ask Hops

Copy a prompt into any chat with Hops, or mention @Hops in a Space.

Plain text
Which company plans are slipping this week?
Plain text
Why is the Acme partner launch at risk, and who owns the blocker?
Plain text
Draft a short nudge to the owner of the pricing page rebuild.
Plain text
List every project with a milestone due in the next 14 days and its status.
Plain text
Which owners have more than one slipping plan?

Example reply:

3 plans are slipping:

  • Pricing page rebuild is 6 days late; blocked on legal copy.
  • SOC 2 evidence collection missed two milestones.
  • Partner launch is on track but has no owner for the press note.

What you get

  • A Slack alert each weekday when something new is slipping, with the owner and a drafted nudge.
  • An updated Table of slipping plans in Tables in the Space, with owner, days late and blocker.
  • On-demand checks. Ask Hops any time for the current picture.

Connections needed

Connect the tools that track your plans. Each card opens Connections in the app.

Projects and due dates (or Jira).

Projects and issues (or Asana).

Owner nudges and alerts.

Launch and review dates.

Set it up

  1. Connect your apps

    Connect the apps above in Connections. Use Asana or Jira, whichever you run projects in.

    See Connections.

  2. Create the Space

    Create a leadership Space. List the company projects to watch in Space context.

    See Spaces and Space context.

  3. Add the skill

    Give Hops these instructions:

    Plain text
    You track company plans. Compare each project's due dates with progress. Flag anything late or likely to slip, say why, and name the owner. Draft a short, friendly nudge per owner. Never change dates yourself.

    See Build a skill.

  4. Schedule it

    Every weekday at 9am Hops checks the projects, posts to Slack only when something new is slipping and updates the Table in Tables.

    See Automation.